HEAVY TRANSPORT THROUGH SPIJKENISSE
On the night of September 16 to 17, three transformers of about 345 tons each were transported from Spijkenisse toward Simonshaven. For this exceptionally heavy transport, Self Propelled Modular Transporters (SPMT’s) were used.
Along the transport route, there are several culverts that had to be crossed by the SPMTs. On behalf of Mammoet, Geobest studied the geotechnical effects of the transport. This involved assessing the load on the existing culverts and, where necessary, developing additional measures.
In locations where the existing culverts could not withstand the temporary transport loads, temporary protective structures were designed, among other things. Based on the analyses carried out, the necessary measures were determined and technically documented.
In this way, Geobest made an important contribution to the safe execution of this exceptional transport and enabled the passage of the heavy transformers over the existing culverts.