RECALCULATION OF 53 BRIDGES IN AMSTERDAM
As part of the Maintenance Advice and the Structural Safety Assessment for the Municipality of Amsterdam, Nebest was asked to carry out verification calculations for various bridges. A verification calculation is prepared if the IHA shows that there is an uncontrolled risk concerning structural safety.
Geobest provided Nebest with the geotechnical input to determine the actual structural safety and remaining service life for 53 unique bridges. These assessments were carried out based on available archival documentation, supplemented with geotechnical and geometric data from public sources. The calculations were prepared in accordance with NEN 9997‑1, NEN 8707, and the ‘Amsterdam Bridges Assessment Framework’ (TAB).
By working closely with the relevant engineers at Nebest, it was possible in most cases to determine that the bridges in question still have substantial remaining service life. Only in a few cases—due to various technical reasons—was it clear that replacement on the short term is desirable. Thanks to the use of relaxed calculation rules for reassessment of existing structures and the frameworks from the TAB, an efficient, targeted analysis was made possible.
With the recalculations of the substructure, Geobest provided the geotechnical input in collaboration with Nebest, enabling the City of Amsterdam to prioritize the replacement tasks in a well-founded and risk-guided way. This allows the city to use its resources efficiently and focus specifically on bridges that demonstrably need reinforcement or replacement.
Photo: Cees Camel, “Bridge 207”, via Wikipedia – CC BY-SA 4.0