Stability study Park Maasdonck in Ridderkerk

Park Maasdonck was built in 1999 and consists of the areas Dokhof, Ankerplaats, and Werfkade. Over the past few years, various studies have been carried out on the stability of the riverbank structures along the Nieuwe Maas. In 2023, it became clear that the riverbank structures need to be replaced.

Research has shown that replacing the existing riverbank structures or installing new ones from the land is hardly feasible. That’s why it was decided to build a support berm in the river along the entire length of Park Maasdonck. This way, the current bank structures are enclosed and no longer serve a function. The construction of the support berm will take place from the river.

On behalf of the municipality of Ridderkerk, Geobest analyzed the stability of the riverbank structures along the Nieuwe Maas using the Finite Element program Plaxis 3D. They also considered the impact of (installing) the support berms on the surrounding area and adjacent buildings. Based on these analyses, the support berm was optimized.

This approach is working towards a sustainable and safe solution for the stability of Park Maasdonck and the surrounding buildings. An impression of the supporting embankment according to the current design is shown next to it.